- Home /
- PIPING SYSTEMS - WATER /
- RIFENG FITTINGS /
- RWMWBE2020 MALE W/BACK ELBOW 20MM-3/4' -100MM LONG - LEAD FREE
Shop Now
-
BATHROOM
- SHOWER COMPONENTS
- TAPWARE
- SHOWER FIXTURES
- SHOWER ENCLOSURES
- TOILET SUITES
- BATHS
- VANITIES
- TOILET PANS
- TOILET SEATS
- CISTERN ACCESSORIES
- CISTERNS
- URINAL
- BIDET SEATS
- FANS / VENTS / LIGHTING
- HEATERS
- BATHROOM ACCESSORIES
- BASINS
- DESIGNER TRAPS
- PLUG AND WASTE
- MIRRORS / CABINETS
- PROGETTO WASTES
- TOILET SPARES
- KITCHEN
- LAUNDRY
- HEATING
- WATER HEATING
-
PLUMBING
- CLEANER
- HOSE TAPS & SPARES
- TAPWARE
- BRASS BALL VALVES - WATER
- GAS BALL VALVES
- PLUMBQWIKS
- WATER FILTER UNITS
- WATER FILTER SPARES
- WALL / FLOOR FLANGES
- PLASTIC TRAP
- TRAP / WASTE SPARES
- PAN CONNECTORS
- HOSE CLIP
- PLUG AND WASTE
- GAS ACCESSORIES
- FLASHING
- FLEXI HOSES
- GALV PIPE FITTING
- HOLDERBATS
- COMBO VALVE KITS
- CALEFFI VALVES
- WATTS VALVES
- TPR VALVES
- NEFA VALVES
- APEX VALVES
- SILFOS
- TAPWARE SPARES
- WATER MAIN
- FLOOR DRAINS
- SHOWER DRAIN / WASTE
- URINAL
- BRASS
- PE PIPE + FITTINGS
- COPPER PIPE & FITTINGS
- PIPING SYSTEMS - WATER
- PIPING SYSTEMS - GAS
- PVC PIPE + FITTINGS
- DRAINAGE
- LAGGING + INSULATION
- PUMPS
- TANKS
- ROOFING
- TOOLS
- FASTENINGS + BRACKETS
- SAFETY
RWMWBE2020 MALE W/BACK ELBOW 20MM-3/4' -100MM LONG - LEAD FREE
$69.56 INC. GST
Code:
RWMWBE2020
Stock Level:
In Stock